{"id":222,"date":"2026-10-06T10:48:51","date_gmt":"2026-10-06T10:48:51","guid":{"rendered":"https:\/\/www.globalsources.qa\/blog\/?p=222"},"modified":"2026-10-06T10:48:51","modified_gmt":"2026-10-06T10:48:51","slug":"north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project","status":"publish","type":"post","link":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/","title":{"rendered":"North Field LNG Expansion: What Equipment is Needed for Qatar&#8217;s Biggest Project?"},"content":{"rendered":"<p>Qatar&#8217;s North Field LNG expansion is one of the largest energy projects in the world. Adding over 48 million tons per year of LNG capacity by the late 2020s, the project involves enormous construction activity across Qatar \u2014 creating sustained, long-term demand for <a title=\"Heavy Machinery Rental Qatar\" href=\"https:\/\/www.globalsources.qa\/heavy-Equipment\"><strong>heavy equipment<\/strong><\/a> across every category.<\/p>\n<p>For contractors involved in North Field packages and for equipment rental companies serving the sector, understanding the scale and nature of equipment requirements on this project is essential.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"658\"><em>&#8220;The North Field expansion is not one project \u2014 it is dozens of parallel projects, all demanding equipment at the same time. Planning and early commitment are everything.&#8221;<\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<h2><strong>Scale of the North Field Expansion<\/strong><\/h2>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The North Field expansion encompasses six new LNG trains \u2014 North Field East (NFE), North Field South (NFS), and further phases \u2014 each requiring enormous construction activity including civil works, structural steel, mechanical installation, and commissioning. The project centres on Ras Laffan Industrial City with supporting infrastructure extending to Al Khor, Mesaieed, and marine facilities along the coast.<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<h2><strong>Key Equipment Categories in High Demand<\/strong><\/h2>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"171\"><strong>Equipment Category<\/strong><\/td>\n<td width=\"289\"><strong>Why It&#8217;s Needed<\/strong><\/td>\n<td width=\"197\"><strong>Demand Level<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Heavy Cranes (100T\u2013700T+)<\/td>\n<td width=\"289\">Module installation, pressure vessel placement, structural steel erection<\/td>\n<td width=\"197\">Extremely High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Crawler Cranes<\/td>\n<td width=\"289\">Long-duration heavy lifts at process facilities<\/td>\n<td width=\"197\">Very High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Excavators (20T\u201350T)<\/td>\n<td width=\"289\">Civil works, foundations, drainage, pipeline trenching<\/td>\n<td width=\"197\">Very High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Generators (500kVA+)<\/td>\n<td width=\"289\">Temporary power for construction camps, tool power, commissioning<\/td>\n<td width=\"197\">High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Low Bed Trailers<\/td>\n<td width=\"289\">Transporting heavy modules and equipment to Ras Laffan<\/td>\n<td width=\"197\">High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">SPMT<\/td>\n<td width=\"289\">Moving oversized modules within the plant<\/td>\n<td width=\"197\">High<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"171\">Dewatering Pumps<\/td>\n<td width=\"289\">Foundation works, trench dewatering<\/td>\n<td width=\"197\">Medium\u2013High<\/td>\n<\/tr>\n<tr>\n<td width=\"171\">Forklifts &amp; Telehandlers<\/td>\n<td width=\"289\">Material handling across large site areas<\/td>\n<td width=\"197\">High<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<h2><strong>What Contractors Need to Prepare For<\/strong><\/h2>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The North Field expansion creates a tightening of equipment availability across Qatar. With multiple large EPC contractors operating simultaneously, crane and heavy equipment availability at short notice becomes increasingly difficult. Contractors involved in North Field packages should plan equipment requirements 3\u20136 months in advance and secure long-term rental agreements early.<\/p>\n<p>Equipment compliance for North Field packages follows QatarEnergy&#8217;s full technical standards \u2014 colour-coded inspection tags, OPITO-certified operators for lifting operations, ATEX equipment in classified areas, and full PTW compliance across all activities.<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><strong>PLANNING: <\/strong>For North Field work, do not assume equipment will be available at short notice. Secure your crane and heavy equipment rental commitments as part of your project mobilisation plan \u2014 ideally 3 months before your first lift.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><a href=\"https:\/\/www.globalsources.qa\/\"><strong>Global Sources<\/strong><\/a> Qatar supplies cranes, excavators, generators, trailers, and dewatering solutions for major Qatar energy projects including North Field-related work at Ras Laffan.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table width=\"100%\">\n<tbody>\n<tr>\n<td><strong>View our full services: globalsources.qa\/heavy-Equipment<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<audio class=\"wp-audio-shortcode\" id=\"audio-222-1\" preload=\"none\" style=\"width: 100%;\" controls=\"controls\"><source type=\"audio\/mpeg\" src=\"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/North-Field-LNG-Expansion-What-Equipment-is-Needed-for-Qatars-Biggest-Project.mp3?_=1\" \/><a href=\"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/North-Field-LNG-Expansion-What-Equipment-is-Needed-for-Qatars-Biggest-Project.mp3\">https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/North-Field-LNG-Expansion-What-Equipment-is-Needed-for-Qatars-Biggest-Project.mp3<\/a><\/audio>\n","protected":false},"excerpt":{"rendered":"<p>Qatar&#8217;s North Field LNG expansion is one of the largest energy projects in the world. Adding over 48 million tons per year of LNG capacity by the late 2020s, the project involves enormous construction activity across Qatar \u2014 creating sustained, long-term demand for heavy equipment across every category. For contractors involved in North Field packages [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":224,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[22,21,19,20],"class_list":["post-222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-heavy-equipment","tag-heavy-duty-equipment-rental-in-qatar","tag-heavy-equipment-rental-company-qatar","tag-heavy-equipment-rental-qatar","tag-heavy-machinery-rental-qatar"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>North Field LNG Expansion Equipment Requirements in Qatar | Global Sources<\/title>\n<meta name=\"description\" content=\"What heavy equipment is required for Qatar&#039;s North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world&#039;s largest LNG project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"North Field LNG Expansion Equipment Requirements in Qatar | Global Sources\" \/>\n<meta property=\"og:description\" content=\"What heavy equipment is required for Qatar&#039;s North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world&#039;s largest LNG project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Global Sources\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-06T10:48:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project-1024x512.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"512\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/#\\\/schema\\\/person\\\/3c2204cd0cdd852757b9253ed5e3654c\"},\"headline\":\"North Field LNG Expansion: What Equipment is Needed for Qatar&#8217;s Biggest Project?\",\"datePublished\":\"2026-10-06T10:48:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/\"},\"wordCount\":443,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png\",\"keywords\":[\"heavy duty equipment rental in Qatar\",\"heavy equipment rental company Qatar\",\"heavy equipment rental Qatar\",\"heavy machinery rental Qatar\"],\"articleSection\":[\"Heavy Equipment\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/\",\"url\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/\",\"name\":\"North Field LNG Expansion Equipment Requirements in Qatar | Global Sources\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png\",\"datePublished\":\"2026-10-06T10:48:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/#\\\/schema\\\/person\\\/3c2204cd0cdd852757b9253ed5e3654c\"},\"description\":\"What heavy equipment is required for Qatar's North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world's largest LNG project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png\",\"contentUrl\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png\",\"width\":1774,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"North Field LNG Expansion: What Equipment is Needed for Qatar&#8217;s Biggest Project?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/\",\"name\":\"Global Sources\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.globalsources.qa\\\/blog\\\/#\\\/schema\\\/person\\\/3c2204cd0cdd852757b9253ed5e3654c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.globalsources.qa\\\/global-sources\\\/blog\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"North Field LNG Expansion Equipment Requirements in Qatar | Global Sources","description":"What heavy equipment is required for Qatar's North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world's largest LNG project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/","og_locale":"en_US","og_type":"article","og_title":"North Field LNG Expansion Equipment Requirements in Qatar | Global Sources","og_description":"What heavy equipment is required for Qatar's North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world's largest LNG project.","og_url":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/","og_site_name":"Global Sources","article_published_time":"2026-10-06T10:48:51+00:00","og_image":[{"width":1024,"height":512,"url":"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project-1024x512.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#article","isPartOf":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/"},"author":{"name":"admin","@id":"https:\/\/www.globalsources.qa\/blog\/#\/schema\/person\/3c2204cd0cdd852757b9253ed5e3654c"},"headline":"North Field LNG Expansion: What Equipment is Needed for Qatar&#8217;s Biggest Project?","datePublished":"2026-10-06T10:48:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/"},"wordCount":443,"commentCount":0,"image":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png","keywords":["heavy duty equipment rental in Qatar","heavy equipment rental company Qatar","heavy equipment rental Qatar","heavy machinery rental Qatar"],"articleSection":["Heavy Equipment"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/","url":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/","name":"North Field LNG Expansion Equipment Requirements in Qatar | Global Sources","isPartOf":{"@id":"https:\/\/www.globalsources.qa\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#primaryimage"},"image":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png","datePublished":"2026-10-06T10:48:51+00:00","author":{"@id":"https:\/\/www.globalsources.qa\/blog\/#\/schema\/person\/3c2204cd0cdd852757b9253ed5e3654c"},"description":"What heavy equipment is required for Qatar's North Field LNG expansion? This guide covers the cranes, excavators, generators, and transport needed for the world's largest LNG project.","breadcrumb":{"@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#primaryimage","url":"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png","contentUrl":"https:\/\/www.globalsources.qa\/blog\/wp-content\/uploads\/2026\/10\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project.png","width":1774,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.globalsources.qa\/blog\/north-field-lng-expansion-what-equipment-is-needed-for-qatars-biggest-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.globalsources.qa\/blog\/"},{"@type":"ListItem","position":2,"name":"North Field LNG Expansion: What Equipment is Needed for Qatar&#8217;s Biggest Project?"}]},{"@type":"WebSite","@id":"https:\/\/www.globalsources.qa\/blog\/#website","url":"https:\/\/www.globalsources.qa\/blog\/","name":"Global Sources","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.globalsources.qa\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.globalsources.qa\/blog\/#\/schema\/person\/3c2204cd0cdd852757b9253ed5e3654c","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9011bdb4e04722d66aa54d784f922870231c448659d059b7fe25b82c61ca8f7d?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.globalsources.qa\/global-sources\/blog"]}]}},"_links":{"self":[{"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/posts\/222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/comments?post=222"}],"version-history":[{"count":1,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/posts\/222\/revisions"}],"predecessor-version":[{"id":225,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/posts\/222\/revisions\/225"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/media\/224"}],"wp:attachment":[{"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/media?parent=222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/categories?post=222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.globalsources.qa\/blog\/wp-json\/wp\/v2\/tags?post=222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}